oracle e-iş yönetim sistemi üretim ve bakım modül danışmanı (oracle e-business suite manufacturing and maintenance consultant)
TROUG Event hosted at the Pera Museum Auditorium, Istanbul Turkey by Kıraca A.Ş.
Speaker: Engin Hafızoğlu
http://youtu.be/0jkcSN6JB-s
You can read the details on My Oracle Support site (Metalink).
Document id: 854117.1
Görev Çubuğu > Araçlar > Diğer Ekranları Kapat adında bir seçenek var.
You can create a performance model for machine and resource setups to include time from one setup to another, including the time required to perform ...
Firstly I create a custom table.
I write an insert sql for the BOM_BILL_OF_MTLS_INTERFACE table for assembly item.
Unable to close EAM Work Orders because Resource transactions are not being processed by the Cost Manager. Records are stuck in the wip_cost_txn_interface (WCTI) table ...
Firstly I create a custom table then I insert the datas from excel sheet.
Then I have written this procedure for creating the maintenance routes.
We create custom table for inserting datas into the mtl_system_items_iterface table. I create an excel sheet and it has same columns with "xx_item_create" table. Then ...
An Oracle White Paper
September 2010
You can download the white paper with the below link.